TownlineWater-E-Phases_website 7-29-15

  • Blue – Phase 1: Target Completion Date – End of July
  • Green – Phase 2: Target Completion Date – End of September
  • Red – Phase 3: Target Completion Date – End of November
  • Yellow – Operational: Properties may connect and start using public water (with an approved application and inspection).

Updates/News Feed

  • 4/29/2016– The Contractors are on site and working on final clean up and restoration.  Work will include final field, lawn and driveway restorations.  Restoration will be occurring on Lewiston Road, Fisher Road, Batavia-Elba Townline Road east of Pekin Road to Batavia-Stafford Townline Road, State Street Road, Norton Road, Bank Street Road, Batavia-Stafford Townline Road and Fotch Road.  Some ditching corrections will occur on Oak Orchard Road.  The Elba meter/PRV vault will also be completed.
  • 4/08/2016- All water mains and services have been installed on Oak Orchard Road.  Most restoration is complete, some restoration items remain.  All water mains and services have been installed on Batavia-Elba Townline Road, Batavia-Stafford Townline Road, State Street Road, Norton Road, Bank Street Road, and Fotch Road.  Restoration will occur in the Spring as weather permits.  The metering vault components and connection to the Village of Elba remain to be completed over the next few weeks.
  • 3/09/16- All water mains have been installed on Oak Orchard Road between West Saile Drive and Ford Road.  Most restoration is complete, some restoration items remain.   All water mains have been installed on Batavia-Elba Townline Road east of Pekin Road, State Street Road, Norton Road, Bank Street Road, Batavia-Stafford Townline Road and Fotch Road.  Restoration will occur in the Spring as weather permits.  All services have been installed on Oak Orchard Road from West Saile Dirve to Ford Road.  All services have been installed on Batavia-Elba Townline Road, Norton Road, and Bank Street Road.  Remaining services on Batavia-Stafford Townline Road and Fotch Road will be installed this week.  The water main connection on Oak Orchard Road between Ford Road and the Village of Elba and the metering vault in the Village of Elba will begin next week and be completed around the end of March.  The services near and north of Ford Road will be completed at the same time.
  • 2/18/16-  All services have been installed on Oak Orchard Road from West Saile Drive to Ford Road.  All services have been installed on Batavia-Elba Townline Road between Norton Road and Batavia-Stafford Townline Road.  All services have been installed on Batavia-Stafford Townline Road and on Bank Street Road south of Batavia-Elba Townline Road except those on the opposite side of the road from the new main where rock drilling methods will be required to complete the road crossing.  Most services have been installed on Batavia-Elba Townline Road  between State Street Road and Norton Road.  Remaining services on Batavia-Elba Townline Road between Norton Road and Pekin Road are being installed this week and the week of February 22, 2016.  Remaining services on Batavia-Stafford Townline Road, Fotch Road, Bank Street Road and Oak Orchard Road north of Ford Road will be scheduled following the services on Batavia-Elba Townline Road.  The water main connection on Oak Orchard Road between Ford Road and the Village of Elba and the metering vault in the Village of Elba will be scheduled and completed around the end of March, 2016.
  • 02/10/16- All water mains have been installed on Oak Orchard Road between West Saile Drive and Ford Road, most restoration is complete, some restoration items remain.  All water mains have been installed on Batavia-Elba Townline Road east of Pekin Road, State Street Road, Norton Road, Bank Street Road, Batavia-Stafford Townline Road and Fotch Road.  Restoration will occur in the Spring as weather permits.  All services have been installed on Norton Road and on Bank Street Road north of Townline Road.  Some services have been installed on Batavia-Elba Townline Road between State Street Road and Batavia-Stafford Townline Road and on Batavia-Stafford Townline Road from Batavia-Elba Townline Road to south of Fotch Road.  Services are being installed this week on Bank Street Road from Batavia-Elba Townline Road to Saile Drive and on State Street Road.
  • 02/08/16- All water mains have been installed on Oak Orchard Road between West Saile Drive and Ford Road, most restoration is complete, some restoration items remain.  All water main and services have been completed on Lewiston Road and Fisher Road.  Remaining restoration will occur in the Spring as weather permits.
  • 01/28/2016- All water mains have been installed on Oak Orchard Road between W. Saile Drive and Ford Road.   Most restoration is complete, some restoration issues remain.  All water mains have been installed on Batavia-Elba Townline Road (east of Pekin Road), State Street Road, Norton Road, Bank Street Road, Batavia-Stafford Townline Road and Fotch Road.  Services are being installed on Batavia-Elba Townline Road and Norton Road.   In February, any remaining services will be installed, including those on Bank Street Road, Batavia -Stafford Townline Road and Fotch Road.  Remaining restoration will occur in the Spring as weather permits.
  • 01/21/2016- All water mains have been installed.  All services on Oak Orchard Road south of Ford have been installed.  Services are starting to be installed on Batavia-Elba Townline Road this week.  Remaining restoration will occur in the Spring.
  • 01/04/2016- All water Main and residential services on Oak Orchard Road have been installed and are in service for Phase 1.  Two farm services on Oak Orchard Road will be tested this month.  Final restoration will be scheduled for Spring at remaining locations.  All water main on Townline Road between Pekin Road and Bank Street Road and on State Street Road have been installed and are in service for Phase 2.  Services on these two roads are being installed and will be completed in January.  Restoration will be scheduled in the Spring for all of this phase.  All water main on Townline Road east of Bank Street Road and on Bank Street Road have been installed and testing is in progress for Phase 3.  Services on these two roads will be installed after testing is completed and after the Phase 2 services.  These should be completed in later January as weather permits.  Restoration will be scheduled in the Spring for all of this phase.
  • 10/15/2015-Visone has completed water main installation, residential service installation and partial restoration for Phase 1.  This includes Oak Orchard Road from W. Saile Drive to Ford Road.  (Phase 1 farm services and 1 residential service remain.)  Phase 2 work is in progress.  Water main has been installed and placed into service on Batavia Elba Townline Road from Pekin Road to and including State Street Road, services and restoration remain.  Water main has been installed on Batavia Elba Townline Road from State Street Road to Bank Street, testing, services and restoration remain.  Visone will now install water main on Norton Road and then on Bank Street Road.
  • 8/25/2015 – Visone Construction has begun work on Phase 2 while completing restoration work on Phase 1.
  • 7/29/2015 – Phase 1 has been placed into operation and property owners in that phase (yellow on the map above) may connect to public water with an approved application and inspection. Visone Construction will continue to install the remainder of water services in Phase 1 and complete any restoration work before beginning Phase 2.
  • 7/17/2015 – Starting next week, Visone Construction will be disinfecting the water main for Phase 1, installing water services to the right-of-way line, and begin restoration work.
  • 6/26/2015 – Target completion dates for each construction phase have been updated. Keep in mind that these dates are targets and are subject to change.
  • 6/19/2015 – Rock blasting operations have been completed on Batavia-Stafford Townline Road and will begin today on Bank Street Road.
  • 5/22/2015 – Rock blasting operations will begin on Tuesday, May 26, 2015 on Batavia-Stafford Townline Road.
  • 5/8/2015 – Visone Construction has installed water main along Oak Orchard Road from W. Saile Drive to Batavia-Elba Townline Road. They will continue to move north along Oak Orchard Road to the Village of Elba.
  • 3/25/2015 – Visone Construction plans to start working on Monday, March 30, 2015. Construction will start on W. Saile Drive and will continue to and along Oak Orchard Road (Route 98).
  • 3/24/2015 – A Frequently Asked Questions section has been added to this site.
  • 3/11/2015 – A Construction Information Letter dated March 2, 2015 has been sent out to all property owners within the Townline Water Project. A copy of the letter has been posted to the Documents Section of this page.
  • 2/26/2015 – The Townline Water Project has established this website to keep all property owners updated. It includes a news feed, important documents, and a contact form.

Frequently Asked Questions

Is there an application fee?

The Water and Sewer Service Application Instruction Sheet does mention that all connection fees must be paid in full before your application is approved and that the fee will be determined by the Town Clerk’s office. However, all application fees will be waived for this project and the Town Clerk’s office will confirm this with you upon application submission.

So I won’t have to pay anything to connect to the public water?

You will be responsible for the installation of your water service from the meter pit up to and inside your home. This responsibility includes hiring a contractor and/or plumber, or doing the work yourself. All costs associated with this task is also your responsibility.

Does my private service need to be inspected and is there an inspection fee?

The work done on your property must be done in accordance with Town of Batavia standards and must be inspected before the trench is backfilled and the water is turned on to your home. There is no inspection fee.

What is a debt service and when must that be paid?

Debt service is what each property contributes to the cost of the total project. This cost is added to your County Tax Bill each year for the term of the loan (38 years).

Will a service be provided to my vacant parcel?

A service will be installed to the front property line of all properties with an existing structure or vacant parcel with an active building permit on file. Future builds that take place after project completion will require the installation of a service line and an application fee will be applicable.

What does the application mean when asking for the Agent Contact Information?

Some property owners hire a third party to manage their private water connection. This third party is the owners agent. If you want a hired contractor to be the main point of contact, place there information in the Agent Contact Information section of the application.

When selecting my service use on the application, do I check Domestic, Fire Service, or Combined?

A Domestic Service is when the water is being supplied for sanitary uses only (drinking water, showers, toilets, etc…). Residential connections will be a Domestic Service Use. A Fire Service is when the water is being used specifically for a private fire protection system. Combined Services provide both domestic service and fire protection through the same line. This question on the application refers only to the service line serving your property and not the mainline that serves everybody on your road.

The application has a Sewer Service Request section. Does this project include public sewer?

The Water & Sewer Service Application is a general form used by the Town of Batavia for both water and sewer projects. Public sewer will not be installed as part of the Townline Water Project and you can check “No” for the “Are you requesting sewer service” question.

Please contact us with any construction concerns & our on-site engineer will get back to you.

Comments are closed.